a) Construction Work: The good news for our esteemed donor is
that the construction work of Ittefaq Kidney & General Welfare
Hospital, by the Grace of Allah Almighty, has been completed.
Now, we have a three-story 60-bedded huge building that is
spread over an area of two kanals while covering 20,436 square
ft space. We also have 12 Private rooms, 3 Wards, 6 Doctors
rooms, X-Ray, Ultrasound, Laboratory rooms and very spacious
waiting area. We have at no stage compromised on the quality of
work. We have installed Champaign color lucky aluminum window
all around, with tented glasses, which is not only an over
lashing work but it also provides a beautiful look as well.
b) Installation of Electric Generator: With the help of
Tanzeem-lil-Sahil-Wal-Mahroom we have this year finally achieved
one of our important goal by the installation of a 100 KV
Caterpillar Electric Generator. The frequent breakdown in WAPDA
electric supply was a source of great inconvenience for our
dialysis patients as well as for the functioning of the most
sophisticated electronic equipment, the dialysis machine etc.
But now after the installation of the above mentioned power
generator we are providing uninterrupted dialysis services to
our esteemed patients. The total cost of the electric generator
is about Rs. 1.3 million and Tanzeem-lil-Sahil-Wal-Mahroom has
very kindly donated Rs. 1 million in this regard.
c) Ultrasound: Since July 2007 we are providing ultrasound
facilities to our patients at the reduced rates. Previously, we
had obtained an ultrasound machine on rent, which was a
financial burden for the hospital. However, now we have
purchased a latest model new ultrasound unit from our own funds
and given us the opportunity to provide cost free services to
the poor patients.
d) X-Ray Unit: In March 2008 our X-Ray plant has started
functioning. It is a most modern latest Japanese plant. The
management is very keen to keep high standard and to maintain
that only quality films like AGFA/FUJI are being used. However,
the services are free for destitute and poor patients.
e) Clinical Laboratory: We have established our own most modern
and well-equipped Clinical Laboratory on partnership basis. Our
goal is to produce accurate clinical test results and ensure
blood transparency of the highest standards. Competent,
qualified and professional staff has been employed. The lab
tests are totally free for the poor patients.
f) Addition of new Dialysis Machines: By the Grace of Allah
Almighty we have added five new Dialysis Machines to our
inventory. Two Youga Toray Dialysis Machines have been installed
in our Kohat unit, whereas three Gambro Dialysis Machines have
been placed in our Peshawar hospital. The total cost of these
machines is expected to be around Rs. 3.8 million. Once again
Tanzeem-lil-Sahil-Wal-Mahroom has generously donated Rs. 0.6
million for this project.
g) Dental Unit: In June 2008 a full fledge dental clinic with a
dental OT has been established in the hospital by a renowned
dentist Dr Rahid Murtaza and he is being assisted by two
experienced lady dentists. The unit is already in function with
full speed. We are getting a large number of dental patients,
while our dental doctors are using disposable inspection kits.
h) Reverse Osmosis Water Purification Plant:
1. Peshawar Reverse Osmosis plant costing worth Rs. 400,000/-
was installed with a capacity to provide pure/potable water up
to 20 dialysis machines. Due to the frequent power breakdown the
old plant had become a headache for the hospital as well as for
the patients.
2. Similarly, a Reverse Osmosis plant costing worth Rs.
350,000/- was also installed in our Kohat unit with a capacity
of 8 dialysis machines.
i) Tube Well: Like shortage of electricity the scarcity of water
for dialysis patients was yet another serious problem. At a
number of times, due to water shortage we were forced to hire a
water tanker from the union council on payment basis. Finally,
the management decided to have its own tube well and by the end
of August 2008 it has started providing water. The estimated
cost of this project is around Rs. 2.5 lac.
|